RANTAMBE HYDRO POWER STATION
The Rentembe dam and power station from the most downstream
project of a cascade of reservoirs and hydro power stations on the
Mahaweli ganga in the Dumbara Valley. Rhe rantambe dam is located just
downsream of the confluence of Uma Oya with Mahaweli Ganga, about 3 kms
downstream of the Randenigala dam and 2.5 kms upstream of the Minipe
anicut. The primary function of the project is the generation electrical
energy using the water releases from Randenigala reservvoir and the
natural flow of the Uma Oya.
The Rantambe project consists of a 420
m. long, 42 m. high gravity type concrete dam across Mahaweli ganga and a
power station on the left bank having two turbine-generator units of
total installed capacity of 52 MW. The gated Spilway, power intake and
the steel penstock are incorporated in the dam. The power station is
expected to generate 180 Gwh. Of Firm energy and 73 Gwh. Of secondary
energy per annum. The switchyard and transmission lines have been
already completed under the Randenigala project.
The construction work of the project was commenced in January 1987. Most of the civil construction wok was completed by February 1990. The valuable timber within the reservoir bed was extracted and the reservoir bed cleared of even shrub and stumps, by the State Timber Corporation. The impounding of the reservoir commenced on 2nd February 1990. and the power generating units 1 and 2 were successfully put into commercial operation on 10th March and 10th April 1990 respectively.
Financing
The foreign cost of the project is financed by a loan of 230 Million DM provided on concessionary terms by the Federal Republic of Germany approximating to Rs.3,027 million. Ceylon Electricity Board (CEB) is financing the local component amounting to Rs.1050 million. The project was competed as scheduled in May 1990.
Consultancy services
The consultancy services are provided by Joint Venture Randenigala (JVR) which were a consortium of three consultancy firms namely Salzgitter Consult GmbH. Agrar Und Hydrotechnik GmbH of the Federal Republic of Germany and Electrowatt Enginerring services Ltd., of Switzerland, in association with the Central Engineering Consultancy Bureau (CECB).
Scope
A dam at Randenigala site consists with two turbaine-generator units of total installed capacity 52 MW and the power station generated 180 GWh of firm energy and 73 GWh of secondary energy.
- Installed capacity 25 MW X 2
- Expected annual average
energy 190 GWh - Commissioned in 1990
- Main contractors
- Civil – JV Rantembe
- Electromechanical – ABB
- Hydro mechanical – Sulzer Escher Wyss
- Located 65 km south-east of Kandy
- Reservoir
- Catchment area : 3118 km2
- Usable water volume : 21 MCM
- Maximum level : 152 m above MSL
- Minimum level : 140 m above MSL
- Penstock
- Steel circular, 4.3 m diameter, 50 m length
- Tailrace
- Length : 10.4 m ; Maximum level : 115 m above MSL; Minimum level : 109.5 m above MSL
- Generator (ABB)
- Conventional vertical
- 32000 kVA, 0.85 PF, 12.5 kV, 1478 A
- 50 Hz, 36 poles, 166 ⅔ rev/min
- Exciter : 160 V, 920 A
- Turbine (Sulzer Escher Wyss)
- Vertical Francis
- Output : 26.54 MW @ 32.7 m effective head (Rated),
27.63 MW @ 33.73 m effective head (Maximum) - Rated discharge : 90 m3/sec
- 166 ⅔ rev/min